Cornell 3D Integration - Custom_Packaging_010130

Custom_Packaging_010130
Two-Tier 3D Integration 1-NRC for Project Management / Design / Mask Fabrication / Tooling / Shipment 2-Cu Pillar Bump on Top Die Wafer Processing: -Batch setup -Pillar bump process: Seed layer deposition + lithography + electroplating + resist/seed layer removal -Wafer thinning -Wafer dicing -Die sorting for flip chip assembly 3-UBM on Bottom Die Wafer Processing: -Batch setup -UBM process: seed layer deposition + lithography + electroplating + resist/seed layer removal -Wafer thinning -Wafer dicing -Die sorting for flip chip assembly 4-Flip Chip Assembly of 1×1 Die Modules -Setup of bonding process (approx. 5–10 setup modules plus analysis) -Flip chip assembly of modules: 30 modules + spares -Optical microscope / X-ray inspection and documentation 5-Packaging of 3D Chip: -COB or Wire-bonded Standard Package 